2020 Xiongan District Rongxi Area Project

Due to the outstanding performance of Camp No. 2, Cocohut also received the resettlement area project. The resettlement area project required a significant amount of space, with a total of 2,918 prefabricated houses required, in addition to a 5,000-square-meter steel structure workshop. Cocohut also took on the project.
When the project was accepted, we quickly assembled professional staff from various departments and formed a project team. The project department initiated the project, with the design department designing the layout and utilities, the production department conducting production, the quality inspection department conducting every step of the product quality inspection, the logistics department handling the loading and transportation, and the after-sales department supervising the installation. Our team visited the construction site daily, actively coordinating with the client in real time. We completed all production and installation work in approximately 36 days, successfully completing the 2,918 units and 5,000-square-meter steel structure workshop project.